How Long Does a Title 24 Report Take?

Standard turnaround is 2–3 business days from the time we receive complete plans. Here is what the time covers, what can slow it down, and how it fits into your permit timeline.

Short answer: A Title 24 report from Title24Comply usually takes 2–3 business days from the time we receive your complete project documents. If you need it sooner, 24-hour rush and same-day Super Rush options are available. Building department plan check is a separate step with its own timeline.

Standard turnaround for a Title 24 energy compliance report at Title24Comply is 2–3 business days from the time we receive your complete project documents. That time covers energy modeling, compliance verification, registry registration where required, and delivery of your finalized PDF report.

Turnaround Options

OptionDelivery timeCost
Standard2–3 business daysIncluded with every order
24-hour rushWithin 24 hours+$49 ADU / +$99 Residential / +$149 Multifamily
Super RushSame day, typically within a few hours+$150 — contact us before ordering to confirm availability

Rush details and requirements are on rush and same-day Title 24 service, and full pricing is on Title 24 report cost.

What Happens During Those 2–3 Business Days

After you order, we review your plans, build the energy model in CEC-approved compliance software, check the design against the current code for your climate zone, register the report with CHEERS if the project requires it, and email you the permit-ready PDF. If the design does not comply as drawn, we contact you with practical options before finishing. Each stage is explained in what happens after you order, and the modeling itself in Title 24 calculations.

Business days exclude weekends and holidays, so an order placed on a Friday afternoon is typically delivered early the following week at standard speed.

What Can Delay a Title 24 Report?

Incomplete documents

This is the most common cause. If key information is missing — no window schedule, no insulation notes, no HVAC type — we contact you before we can start, and the turnaround begins once we have what we need. Check what documents to upload before ordering.

Project complexity

Larger multifamily buildings with complex HVAC zoning take longer to model than a simple ADU.

Designs that need changes to comply

If the design does not pass as drawn, time spent agreeing on changes — for example, better windows or a different water heater — adds to the timeline.

Peak demand

Order volume rises during busy permit seasons, which can affect standard turnaround.

How to Get the Fastest Turnaround

Upload complete plans at checkout, specify your HVAC type and intended insulation in the order notes, and include your full project address. The more complete your submission, the faster we can deliver.

Revisions and Plan Check Timing

Two revisions are included with every report. If the plans change or the plan checker asks for corrections, send us the updated sheets or the comment letter and we revise and re-issue the report. Revision time depends on the size of the change. See plan check comments and what happens when plans change.

Plan check itself is controlled by your building department, not by us. Review times vary by city and county and by how busy the department is, so check with your jurisdiction when you plan your schedule. A fast Title 24 report removes one step from the critical path; it does not change the department's review time.

Frequently Asked Questions

How long does a Title 24 report take?

Typically 2–3 business days after we receive complete plans. 24-hour rush and same-day Super Rush are available.

When does the turnaround clock start?

When we have complete project documents. If something is missing, we contact you, and the turnaround runs from when the missing information arrives.

How long do revisions take?

It depends on the change. A small plan check correction is usually quicker than the original report; a redesign that changes the energy model takes longer.

Does a rush report speed up my permit?

It speeds up the report only. Plan check and permit issuance follow your building department's schedule.

Questions & Answers

Related Title 24 Topics

Browse the complete Title 24 guide →

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • Two Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA
HOW IT WORKS

From Order to Delivery

Simple, fast, and permit-ready.

Select your Title 24 report type, fill in project details, and pay online
1 Place Your Order

Select your report type, fill in your project details, upload your plans, and complete payment. The whole process takes under 5 minutes.

• Select Your Report Type • Fill In Project Details • Secure Online Payment
Our team reviews your architectural plans and prepares your Title 24 compliance report
2 We Prepare Your Report

Our team reviews your architectural plans, runs the Title 24 energy calculations, and gets your CF1R or LMCC report ready for submission.

• Plan Review & Analysis • CEC-Approved Software • CHEERS Database Filing
Title 24 report delivered to your email inbox as a permit-ready PDF
3 Delivered to Your Email

Your completed, permit-ready report is emailed to you as a PDF — stamped, CHEERS-registered, and ready to submit to your building department. Revisions are available if needed.

• Permit-Ready PDF by Email • Standard 2–3 Business Days • Two Revisions Included

Rush and same-day service are available. For urgent projects requiring delivery within a few hours, please contact us directly.