Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
New Construction Title 24

New Construction Title 24 Energy Reports

Professional, permit-ready New Construction Title 24 energy compliance reports for California — fixed pricing, fast turnaround, online ordering.

Order Now → Contact Us

New construction — a new single-family home or building — must meet the full Title 24 energy standards, including the statewide solar requirement for most new low-rise residential. A complete energy compliance report is required before permits are issued.

Who needs a New Construction Title 24 report

Homeowners, contractors, architects, and developers undertaking new construction projects in California typically need a Title 24 report as part of the permit process. Title 24 is a statewide California energy code. New Construction projects follow the same statewide standards; the exact requirements depend on your project's scope and address, which we model in CEC-approved compliance software.

Pricing

Standard turnaround: 2–3 business days. Rush (next business day): +$49 ADU / +$99 Residential / +$149 Multifamily. Super Rush (same day — typically within a few hours): +$150. Every report includes two revisions. See the pricing page.

What we need

What you'll receive

Our process

1
Upload Plans
Send plans + project details online.
2
Review
We review scope and documents.
3
Energy Modeling
Modeled in CEC-approved software.
4
Quality Review
Checked, signed, registered.
5
Delivery
Permit-ready PDF by email.

Sample report

Your delivered package is a professionally signed, registry-registered PDF containing your CF1R (and LMCC where applicable) and all required compliance forms — formatted and ready to submit with your permit application.

Everything You Need to Know About New Construction Title 24

15 in-depth New Construction Title 24 guides.

Related Title 24 Services

Related Climate Zones

Requirements scale with your climate zone — set by your project address. All climate zones →

Questions & Answers

Do new construction projects need a Title 24 report?+
In most cases yes — new construction projects that add or alter conditioned space require a Title 24 report before a permit is issued.
How much does a new construction Title 24 report cost?+
Flat statewide pricing from $199 depending on project type and size, with two revisions included.
How long does it take?+
Standard turnaround is 2–3 business days; rush and same-day Super Rush options are available.

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • 2 Free Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA

Ready to Order Your Title 24 Report?

Upload your plans, check out online, and get a permit-ready report in 2–3 business days. Starting at $199.

Contact Us