Short answer: Title 24 requires solar PV on most newly constructed single-family homes, a rule in place since the 2019 Standards took effect in 2020. Under the 2025 code, PV sizing is based on the home's solar access roof area, and new one- or two-unit dwellings with electrical service over 125 A must be battery-ready unless a battery is installed. A battery is not prescriptively required for a single-family home, but a qualifying one can earn credit. Your Title 24 report confirms what applies to your project.
Need a Title 24 report for your permit?
ADU from $199 · Single-family from $245 · Multifamily from $345 per building. Permit-ready PDF in 2–3 business days, CHEERS-registered where required, two revisions included.
Who Must Install Solar Under Title 24?
The solar mandate in the Energy Code applies to newly constructed single-family homes, with exceptions, for example for roofs with very limited solar access. Additions and alterations to existing homes generally do not trigger it. New detached ADUs sit in between, because they are usually treated as new buildings.
| Project | How the PV requirement is treated | Read more |
|---|---|---|
| New single-family home | Required, unless an exception applies | New home solar |
| New detached ADU | Generally treated as a newly constructed building, so PV can apply unless an exception applies | Does an ADU need solar? |
| Attached ADU or garage conversion | Generally an addition or alteration, which does not trigger the new-home PV requirement | Garage conversion solar |
| Home addition | Generally does not trigger the new-home PV requirement | Addition solar |
| Re-roof or other alteration | Does not trigger the new-home PV requirement | Re-roof rules |
In every case, the Title 24 report determines how your project is classified and whether an exception applies.
How the 2025 Code Sizes Solar PV
The 2025 Standards base PV sizing on the home's total solar access roof area (SARA), the roof area the code counts as having solar access. The CEC's What's New for Single-Family Residential fact sheet summarizes the rule as SARA × 18 for steep-sloped roofs and SARA × 14 for low-sloped roofs (§150.1(c)14). Roof slope, shading and layout therefore shape the result, which is why accurate roof plans and a site plan showing orientation matter.
Your Title 24 report does the calculation and shows the PV requirement on the compliance forms, so your solar designer and the building department work from the same figure. Homes with very limited solar access may qualify for an exception, and the report shows whether one applies.
Battery-Ready (BESS-Ready) Requirements
Under the 2025 code, battery-ready wiring is a mandatory measure (§150.0(s)) for newly constructed single-family one- or two-unit dwellings with electrical service over 125 A. Battery-ready means the electrical system is prepared so a battery energy storage system (BESS) can be added later. The requirement does not apply if a battery is installed. Your electrical plans show how it is met, and your report confirms whether it applies.
Because the rule turns on the size of the electrical service, settle the service size early in design. A change to the service later can change what the plans need to show.
Batteries and JA12 Credit
A battery is not prescriptively required for a single-family home. Under the performance method, a qualifying battery can earn compliance credit, which counts toward the design's energy budget. Qualification requirements are in Joint Appendix 12 of the Reference Appendices; see the Title 24 code for what JA12 covers. If you plan to install a battery, tell us when you order so it is modeled from the start.
Solar, Roofs and Climate Zones
Roof work and solar often meet on the same permit. Roof area under building-integrated PV or solar thermal panels is exempt from the cool roof rules for re-roofs; see Title 24 re-roof requirements. The PV requirement itself is statewide, but your climate zone affects the rest of the energy model. Find yours on the climate zone lookup.
Multifamily and Nonresidential Buildings
Certain multifamily and nonresidential buildings have prescriptive PV and battery requirements of their own, which depend on building type and other factors and differ from the single-family rules on this page. For apartment and condo projects, see multifamily Title 24 reports. For commercial buildings, request a quote through our commercial quote form.
What Your Title 24 Report Covers
Title24Comply models every project in CEC-approved compliance software. For a new home or detached ADU, the report shows whether PV applies, the required system size, whether battery-ready wiring applies, and any battery credit modeled. See new construction Title 24, or see pricing and order online.
Frequently Asked Questions
Is solar required for a home addition?
Generally no. Additions and alterations do not trigger the new-home PV requirement. Your report confirms how your project is classified.
Do I have to install a battery?
Not for a single-family home. If the home is newly built, has one or two units and has electrical service over 125 A, it must be battery-ready unless a battery is installed. A qualifying battery can also earn performance credit.
What if my roof is heavily shaded?
The code has exceptions for roofs with very limited solar access. Whether your roof qualifies depends on the design and site, and the report determines it.
Did the 2025 code change how PV is sized?
Yes. Sizing now uses the total solar access roof area, with a different multiplier for steep-sloped and low-sloped roofs. See 2025 Title 24 changes for the other updates.