Short answer: The 2025 Title 24 Energy Code applies to permit applications submitted on or after January 1, 2026. For single-family homes, the biggest changes are heat pump space heating as the prescriptive baseline in every climate zone, PV sized from the roof's solar access area, battery-ready wiring for new homes with electrical service over 125 A, a mandatory 0.40 cap on average window U-factor and new heat pump water heater rules. Field verification is now called ECC verification.
Permit under the 2025 code?
Our reports are prepared in CEC-approved software for the code cycle your permit falls under. ADU from $199 · Single-family from $245 · Multifamily from $345 per building. Delivered in 2–3 business days.
When the 2025 Code Applies to Your Permit
California updates its Energy Code about every three years. The Title 24 2025 cycle, often called Title 24 2026 because it took effect that year, replaced the 2022 Standards for permit applications submitted on or after January 1, 2026. The submission date of your application, not the start of construction, decides which cycle applies.
This summary follows the CEC's What's New for Single-Family Residential fact sheet (revised February 19, 2025). Your Title 24 report confirms which items apply to your project.
What's New in the 2025 Energy Code
Solar PV and battery storage
PV sizing now uses the home's total solar access roof area (SARA). The CEC summarizes the rule as SARA × 18 for steep-sloped roofs and SARA × 14 for low-sloped roofs (§150.1(c)14). Newly constructed single-family one- or two-unit dwellings with electrical service over 125 A must be battery-ready (BESS-ready) unless a battery is installed (§150.0(s)). See solar and battery requirements.
Heating, cooling and ventilation
- Heat pump space heating is prescriptive in all climate zones; the performance path is the alternative (§150.1(b)1).
- Refrigerant charge verification for heat pumps in all zones and for air conditioners in Climate Zones 2 and 8–15, plus HRV/ERV fault indicator displays verified by an ECC-Rater (§150.1(c)6–7, 15).
- Heat pump controls: defrost delay timers of 90 minutes or more (with exceptions), supplementary heat only below 35°F except for defrost or emergencies, electric resistance supplementary heat capped at 2.7 kW per ton of nominal cooling capacity, and thermostats that show outdoor temperature. Installers certify these on the CF2R (§150.0(h)–(i)).
- Ducts in unvented attics may be insulated to R-4.2 when other requirements are met (§150.0(m)1Bi).
- Additions may size equipment with block loads, within maximum capacity limits (§150.2(a)1E).
- Updated whole-dwelling ventilation rules for balanced and supply-only systems (§150.0(o)1C).
Envelope: insulation and windows
- Mandatory walls: maximum U-0.095 for 2×4 framing (at least R-15) and U-0.069 for 2×6 framing (at least R-21) (§150.0(c)).
- Prescriptive vented attic: R-38 in Climate Zones 1 and 8–16, R-30 in Zones 2–7; cathedral ceilings R-38 with no radiant barrier (§150.1(c)1Aiii).
- Windows: a mandatory maximum weighted-average U-factor of 0.40, including skylights, except in Fire Hazard Severity Zones (§150.0(q)). Prescriptive maximums are U-0.27 in Zones 1–5, 11–14 and 16, and U-0.30 in Zones 6–10 and 15 (§150.1(c)3A).
- Added or replaced windows in Climate Zone 15: maximum SHGC 0.23 (§150.2(b)1).
The full zone table is on our insulation requirements by climate zone page.
Water heating
- Heat pump water heaters (HPWH) drawing unconditioned air need backup heat unless the compressor cutoff is below the local Heating Winter Median of Extremes, and HPWH installs need ventilation or a minimum room volume (§110.3(c)7A–B).
- New homes need a circuit of at least 30 A for a future HPWH (§150.0(n)1Ai).
- Gas tankless: the exception was removed in Climate Zones 3, 4, 13 and 14 for homes with heat pump space conditioning (§150.1(c)8), and gas tankless is no longer a prescriptive option for single-family additions (§150.2(a)1D).
Lighting, pools and spas
All luminaires and light sources must meet JA8, with new exceptions; Table 150.0-A was removed, and lights built into range hoods and bathroom fans need no dimmer (§150.0(k)). Primary pool and spa heaters must be heat pumps or solar, or use at least 60% renewable or recovered energy, with exceptions (§110.4(c)).
The performance method
The performance budget is now expressed as long-term system cost (LSC, in Total and Efficiency versions) and source energy (§150.1(a)). The proposed design is still modeled against a code-defined standard design; see Title 24 calculations.
HERS becomes ECC
The CEC now calls field verification ECC (Energy Code Compliance) verification and the testers ECC-Raters, though many people still say HERS. The checks themselves, such as duct leakage and refrigerant charge, are the same kind of work. To see whether your project needs one, read do I need a HERS rater.
CHEERS approved as ECC-Provider
On November 12, 2025, the CEC approved CHEERS as an ECC-Provider and as the residential data registry for the 2025 Energy Code. As of November 2026, the CEC lists CHEERS as the only approved ECC-Provider; another company has applied and is under review. See the CEC's ECC-Provider page.
Who Is Affected by the 2025 Title 24 Changes
| Project | What to check under the 2025 code | Read more |
|---|---|---|
| New single-family home | Heat pump baseline, SARA-based PV, battery-ready wiring, attic and window values, future-HPWH circuit | New construction |
| New detached ADU | Usually treated as a new building, so PV can apply | ADU compliance |
| Addition | Block-load equipment sizing; gas tankless no longer prescriptive | Additions |
| HVAC changeout | Heat pump and thermostat requirements that apply to the new equipment; ECC verification as listed on your forms | HVAC replacement |
| Window replacement | SHGC 0.23 maximum in Climate Zone 15 | Window rules |
| Water heater replacement | Heat pump water heater conditions; gas and propane still allowed | Water heaters |
| Re-roof | Cool roof rules in Climate Zones 4 and 6–15, by roof slope | Re-roofs |
How to Tell Which 2025 Rules Apply to You
Most new homes and ADUs comply through the performance method, which trades features against each other within an energy budget. Mandatory measures, such as the wall minimums, the 0.40 window cap and battery-ready wiring where it applies, hold either way.
Title24Comply models every project in CEC-approved software for the code cycle your permit falls under, and the report lists the measures your plans must show. If your application was submitted before January 1, 2026, tell us so the report follows the 2022 Standards. You can see pricing and order online.
Frequently Asked Questions
Does the 2025 code ban gas appliances?
No. Heat pump space heating is the prescriptive baseline, but the performance method lets a design meet its budget in other ways, and a gas or propane water heater remains a prescriptive option for replacements. Some cities adopt stricter local rules, so check with your building department.
My application was submitted in December 2025. Which code applies?
Generally the 2022 Standards, because the 2025 code applies to applications submitted on or after January 1, 2026. If the application expires and you reapply, the newer code may apply. Your building department confirms.
Is a battery required under the 2025 code?
Not for a single-family home. New one- or two-unit dwellings with service over 125 A must be battery-ready unless a battery is installed, and a qualifying battery can earn credit in the performance method.