Home Pricing How It Works Services Locations Climate Zones Title 24 Guide About Contact Order Now →
HVAC Replacement Title 24

HVAC Replacement Title 24 Energy Reports

Replacing a furnace, air conditioner or heat pump can trigger Title 24 requirements and HERS testing. Upload your project details online and receive a permit-ready report, typically in 2–3 business days.

Order Now → Contact Us

Short answer: Replacing or changing out HVAC equipment can trigger Title 24 requirements in many California jurisdictions — covering equipment efficiency, duct sealing, and verification. Whether a report is required depends on scope and your local building department. When one is needed, Title24Comply prepares HVAC replacement Title 24 reports online, with standard delivery in 2–3 business days.

Who Needs an HVAC Replacement Title 24 Report

Homeowners, contractors, architects, and developers undertaking HVAC replacement projects in California typically need a Title 24 report as part of the permit process. Title 24 is a statewide California energy code. HVAC replacement projects follow the same statewide standards; the exact requirements depend on your project's scope and address, which we model in CEC-approved compliance software.

Some departments accept a simple checklist-style form for a straight changeout; others ask for a full compliance document. See do HVAC replacement projects need Title 24? and when Title 24 is required.

What Triggers Title 24 on an HVAC Replacement

Under the Energy Code (Title 24, Part 6), an HVAC change is an alteration. The requirements that apply depend on what is being replaced:

How much duct work is altered matters; see HVAC replacement thresholds and the full list on HVAC replacement Title 24 requirements.

Heat Pump Title 24 Changeouts

Heat pump changeouts are now one of the most common HVAC alterations in California. The 2022 and 2025 code cycles emphasize heat pumps, and switching from a gas furnace to a heat pump is generally straightforward from a compliance standpoint. The same alteration rules still apply: the equipment must meet the efficiency requirements, ducts that stay in service may need sealing and testing, and verification items apply as flagged. Your climate zone affects heating loads and some requirements. See heat pump replacement requirements and, for zone-specific notes, pages such as Climate Zone 12 heat pump requirements or the climate zone lookup.

HERS Verification for HVAC Alterations

A Title 24 report is prepared before work starts. After installation, a HERS rater (under the 2025 code cycle, the CEC calls this ECC verification) tests the items the compliance document flags. For HVAC alterations these commonly include:

Results are registered with a HERS data registry such as CHEERS. See HERS rater vs Title 24 report and what CHEERS is.

What We Need

See documents needed for an HVAC replacement.

Pricing

The final price follows the square footage or unit count; if an adjustment is needed, we contact you before proceeding. See HVAC replacement Title 24 cost or the pricing page.

Turnaround

Standard turnaround: 2–3 business days. Rush (next business day): +$49 ADU / +$99 Residential / +$149 Multifamily. Super Rush (same day — typically within a few hours): +$150. Every report includes two revisions.

What You'll Receive

Common Plan-Check Issues

See HVAC replacement plan-check corrections and common HVAC replacement mistakes.

Sample Report

Your delivered package is a professionally signed, registry-registered PDF containing your CF1R (and LMCC where applicable) and all required compliance forms — formatted and ready to submit with your permit application.

Frequently Asked Questions

What form is used for an HVAC changeout?

Prescriptive residential HVAC alterations are commonly documented on a CF1R-ALT-02 form, though form names can change between code cycles and some jurisdictions have their own requirements. See what a CF1R is.

Does replacing only the outdoor unit trigger Title 24?

It can. Replacing a condenser or heat pump is generally an HVAC alteration, and the building department may require duct testing and refrigerant verification. Check with your department.

Is a heat pump changeout easier to permit than gas?

Often, since current code cycles favor heat pumps. The same duct and verification requirements still apply as flagged.

Who arranges the HERS test?

Usually the installing contractor or homeowner schedules a HERS rater after installation. The Title 24 report identifies which items need testing.

Everything You Need to Know About HVAC Replacement Title 24

15 in-depth HVAC Replacement Title 24 guides.

Related Title 24 Services

Related Climate Zones

Requirements scale with your climate zone — set by your project address. All climate zones →

Questions & Answers

Related Title 24 Topics

Browse the complete Title 24 guide →

Title 24 by City

We serve all of California — see all locations.

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • Two Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA
HOW IT WORKS

From Order to Delivery

Simple, fast, and permit-ready.

Select your Title 24 report type, fill in project details, and pay online
1 Place Your Order

Select your report type, fill in your project details, upload your plans, and complete payment. The whole process takes under 5 minutes.

• Select Your Report Type • Fill In Project Details • Secure Online Payment
Our team reviews your architectural plans and prepares your Title 24 compliance report
2 We Prepare Your Report

Our team reviews your architectural plans, runs the Title 24 energy calculations, and gets your CF1R or LMCC report ready for submission.

• Plan Review & Analysis • CEC-Approved Software • CHEERS Database Filing
Title 24 report delivered to your email inbox as a permit-ready PDF
3 Delivered to Your Email

Your completed, permit-ready report is emailed to you as a PDF — stamped, CHEERS-registered, and ready to submit to your building department. Revisions are available if needed.

• Permit-Ready PDF by Email • Standard 2–3 Business Days • Two Revisions Included

Rush and same-day service are available. For urgent projects requiring delivery within a few hours, please contact us directly.

Ready to Order Your Title 24 Report?

Upload your plans, check out online, and get a permit-ready report in 2–3 business days. Starting at $199.

Contact Us