Home ADU Reports Residential Reports Multifamily Reports Title 24 Guide Pricing How It Works Services Locations Climate Zones About Contact Order Now →
Title 24 Basics

The Title 24 Energy Code

How California's Title 24 building code is organized, what Part 6 covers, which code cycle applies to your permit, and where the Reference Appendices fit in.

Short answer: The Title 24 code is the California Building Standards Code — Title 24 of the California Code of Regulations. It is divided into parts covering building, electrical, mechanical, plumbing, fire, green building and energy. When people mention Title 24 on a permit, they usually mean Part 6, the Building Energy Efficiency Standards. The current cycle is the 2025 Energy Code, which applies to permit applications submitted on or after January 1, 2026.

What Is the Title 24 Code?

Title 24 is the set of building regulations every California project is designed and permitted under. Each part covers a different discipline, and your building department enforces them together. Most parts are based on national model codes with California amendments; the Energy Code in Part 6 is written specifically for California.

The Parts of Title 24

These are the parts most residential projects deal with:

PartNameWhat it covers
Part 2California Building CodeStructural, fire-resistance, egress and general building requirements, mainly for nonresidential and larger buildings; includes Chapter 7A for wildfire areas
Part 2.5California Residential CodeBuilding requirements for one- and two-family homes and townhouses
Part 3California Electrical CodeWiring, circuits and electrical equipment
Part 4California Mechanical CodeHeating, ventilation, air conditioning and ductwork installation
Part 5California Plumbing CodeWater supply, drainage, venting and fixtures
Part 6California Energy Code (Building Energy Efficiency Standards)Energy efficiency of the envelope, windows, HVAC, water heating, ventilation, lighting, solar PV and battery storage
Part 9California Fire CodeFire prevention, fire protection systems and hazardous materials
Part 11California Green Building Standards Code (CALGreen)Sustainability measures such as water conservation, EV readiness and construction waste

A Title 24 energy report deals only with Part 6. See what a Title 24 report is.

Title 24 Part 6: The California Energy Code

Title 24 Part 6 sets minimum energy-efficiency standards for new buildings, additions and many alterations, for both residential and nonresidential projects. It has been in place since 1978. Part 6 includes mandatory measures that always apply, prescriptive requirements that vary by climate zone, and a performance path that lets designers model the whole building in CEC-approved software. For what it asks of each building system, see Title 24 requirements; for how compliance is modeled, see Title 24 calculations.

The Reference Appendices

Part 6 is supported by the Reference Appendices, a separate volume the code points to for technical detail. They are grouped as Joint Appendices (JA), which apply to both residential and nonresidential buildings, plus Residential and Nonresidential Appendices. They include items such as climate zone definitions, HERS field verification procedures and qualification requirements for products such as solar and battery systems.

CEC vs CBSC: Who Writes Title 24?

Two state agencies are involved, and they are often confused.

For energy questions, the CEC is the source. Local building departments enforce both through plan check and inspection.

The Three-Year Code Cycle

Title 24 is updated about every three years. The energy code has moved steadily toward all-electric, high-efficiency buildings: the 2019 Standards introduced solar PV for most new single-family homes, and the 2022 Standards, effective January 1, 2023, placed strong emphasis on heat pumps and electric-ready measures.

Title 24 in 2026: The 2025 Energy Code

"Title 24 2026" refers to the 2025 Energy Code, which applies to permit applications submitted on or after January 1, 2026. It continues the emphasis on heat pumps and electric-ready construction. Under this cycle the CEC refers to field verification as ECC (Energy Code Compliance) verification, although many people still say HERS — see HERS raters and Title 24 reports. Form names can also change between code cycles, so older CF1R examples may not match the current forms exactly — see what a CF1R is.

What the code cycle means for your permit

The code cycle in effect when your permit application is submitted is the one your project must meet. Plans submitted before January 1, 2026 generally stay under the 2022 Standards; applications submitted on or after that date use the 2025 Standards. If a permit expires and you reapply, the newer code may apply. Title24Comply models every project in CEC-approved software for the applicable cycle, so tell us when you plan to submit. See building department acceptance.

Frequently Asked Questions

What is JA12?

Joint Appendix 12 (JA12) in the Reference Appendices covers qualification requirements for battery storage systems used for Energy Code compliance. Requirements can change between cycles, so verify the details in the current Reference Appendices.

Is Chapter 7A part of the energy code?

No. Chapter 7A is in Part 2, the California Building Code. It covers construction materials and methods for wildfire-prone areas (wildland-urban interface), not energy efficiency. A project can be subject to both.

Is Title 24 the same as CALGreen?

No. CALGreen is Part 11 and covers green building measures. The Energy Code is Part 6. Both are part of Title 24 and both may apply to your project.

Where can I read the Title 24 code?

The CEC publishes the Energy Code, Reference Appendices and compliance manuals on its website, and the CBSC publishes the full Title 24 code.

Do I need a Title 24 report under the 2025 code?

Most new homes, ADUs, additions and many alterations do. See when Title 24 is required, then order your report online.

Questions & Answers

Related Title 24 Topics

Browse the complete Title 24 guide →

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • Two Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA
HOW IT WORKS

From Order to Delivery

Simple, fast, and permit-ready.

Select your Title 24 report type, fill in project details, and pay online
1 Place Your Order

Select your report type, fill in your project details, upload your plans, and complete payment. The whole process takes under 5 minutes.

• Select Your Report Type • Fill In Project Details • Secure Online Payment
Our team reviews your architectural plans and prepares your Title 24 compliance report
2 We Prepare Your Report

Our team reviews your architectural plans, runs the Title 24 energy calculations, and gets your CF1R or LMCC report ready for submission.

• Plan Review & Analysis • CEC-Approved Software • CHEERS Database Filing
Title 24 report delivered to your email inbox as a permit-ready PDF
3 Delivered to Your Email

Your completed, permit-ready report is emailed to you as a PDF — stamped, CHEERS-registered, and ready to submit to your building department. Revisions are available if needed.

• Permit-Ready PDF by Email • Standard 2–3 Business Days • Two Revisions Included

Rush and same-day service are available. For urgent projects requiring delivery within a few hours, please contact us directly.

Ready to Order Your Title 24 Report?

Upload your plans, check out online, and get your permit-ready report in 2–3 business days. Starting at $199.

Contact Us