Home ADU Reports Residential Reports Multifamily Reports Commercial Reports Wholesale for Firms Title 24 Guide Pricing How It Works Services Locations Climate Zones About Contact Order Now →
Registry & Forms

How to Verify a Registered CF1R in CHEERS

A registered CF1R carries the same registration number, date and watermark on every page. Here is how to check yours before it goes to plan check.

Short answer: A CF1R registered in CHEERS shows the same registration number and registration date and time on every page, a CHEERS "registered" watermark behind each page, and a footer that reads "ECC Provider: CHEERS" with the report and schema version. Check that these match on every page and that the form describes your actual plans. There is no public CHEERS document search we can point you to, so to confirm with the registry itself, use CHEERS project access, ask the documentation author, or call CHEERS.

Need a registered CF1R?

We prepare your Title 24 report and register it in CHEERS where the project requires it. ADU from $199 · Single-family from $245 · Multifamily from $345 per building. Delivered in 2–3 business days.

What a Registered CF1R Shows

Registration turns a compliance report into a controlled document. The registry prints identifying details onto every page, so a plan checker can tell at a glance that the pages belong together and came from the registry rather than from a draft.

You can see each of these on our redacted CF1R sample report, a 2025 CF1R-PRF-01-E. For what the rest of the document means, see what a CF1R report is.

How to Verify a CF1R, Step by Step

  1. Find the registration number. Note the number in the footer of page 1, then confirm the same number is printed on every other page.
  2. Match the registration date and time. The date and time beside the number should be identical on all pages.
  3. Look for the watermark on each page, not just the first. A page without it is not part of the registered set.
  4. Read the provider line. The footer should name CHEERS as the ECC Provider and show the report and schema versions, along with the standards the report was run under.
  5. Count the pages. Each page header shows "Page X of Y". Make sure none are missing.
  6. Compare it with your plans. Check the project name, scope (new construction, addition or alteration), climate zone, conditioned floor area, windows, heating and cooling, and water heater against the permit set.
  7. Check the declarations. The last page carries the documentation author's and responsible designer's signed statements.

Building departments run much the same registered CF1R check: they confirm that the watermark, registration date and registration number match on all pages. See what building departments look for.

If the CF1R Is Not Registered or the Numbers Differ

No watermark or registration number

A CF1R without registration details may be a preliminary or unregistered copy. That can be acceptable where the project does not require registration, which the building department decides. If your CF1R lists ECC (HERS) verification items, though, ask the documentation author for the registered PDF before you submit.

Numbers or dates differ between pages

Mismatched pages usually mean two versions of the report were combined, often after a revision. Do not submit a mixed set. Ask the author for the complete, current registered PDF, and throw away the old pages so they do not end up in the permit file.

The footer shows CalCERTS

CalCERTS stopped operating as a HERS Provider starting August 2, 2024, and its registry stayed open for downloads only until September 1, 2024. If your document was registered there, read what the CalCERTS closure means and check with your building department.

Confirming Registration With CHEERS Directly

There is no public CHEERS document-search tool we can point you to. To confirm a registration with the registry itself, use one of these routes:

Homeowner documents later in the project

CHEERS also produces documents for the owner as work proceeds. A Consumer Information Form must be completed before ECC field verification starts, a Project Owner Report is provided after testing, and a Project Status Report is available once an independent ECC-Rater has verified and tested the work. Project Status Reports may carry a "Scan to Validate" code. The CHEERS homeowner page explains access.

After Plan Changes: Re-Registration

A registered CF1R describes one version of the design. If windows, insulation, heating and cooling, the water heater or the floor area change, the report has to be updated and registered again. Run the same check on the updated set: every page should match every other page, and none should be left over from the earlier version. Make sure the building department and your rater work from the new set. See what happens if plans change and, for corrections a plan checker requests, plan check comments.

Which Code Cycle Your CF1R Should Show

The 2025 Energy Code applies to permit applications submitted on or after January 1, 2026, so a new application today should be supported by a CF1R run under the 2025 standards. The CEC approved CHEERS on November 12, 2025 as an ECC-Provider and as the 2025 residential data registry, and CHEERS is also approved for 2013, 2016, 2019 and 2022 documentation. As of November 2026 the CEC's ECC-Provider list names CHEERS as the only approved ECC-Provider.

Frequently Asked Questions

Where is the CHEERS registration number on a CF1R?

In the footer of every page, next to the registration date and time. The same number should appear on all pages.

Can I search CHEERS for a CF1R by address?

There is no public document search we can point you to. Use CHEERS project access, ask the documentation author, or call CHEERS.

What does "ECC Provider: CHEERS" mean in the footer?

It names the CEC-approved provider whose registry issued the document. ECC is the 2025 code's term for the field verification many people still call HERS; see CF1R vs CF2R vs CF3R for where that fits.

Do I need to re-check after every revision?

Yes. Check each registered revision page by page before it replaces the earlier set in your permit file.

Who do I contact if the numbers do not match?

The documentation author first. If we prepared your report, contact us with the page numbers that differ.

Questions & Answers

Related Title 24 Topics

Browse the complete Title 24 guide →

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • Two Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA
HOW IT WORKS

From Order to Delivery

Simple, fast, and permit-ready.

Select your Title 24 report type, fill in project details, and pay online
1 Place Your Order

Select your report type, fill in your project details, upload your plans, and complete payment. The whole process takes under 5 minutes.

• Select Your Report Type • Fill In Project Details • Secure Online Payment
Our team reviews your architectural plans and prepares your Title 24 compliance report
2 We Prepare Your Report

Our team reviews your architectural plans, runs the Title 24 energy calculations, and gets your CF1R or LMCC report ready for submission.

• Plan Review & Analysis • CEC-Approved Software • CHEERS Database Filing
Title 24 report delivered to your email inbox as a permit-ready PDF
3 Delivered to Your Email

Your completed, permit-ready report is emailed to you as a PDF — stamped, CHEERS-registered, and ready to submit to your building department. Revisions are available if needed.

• Permit-Ready PDF by Email • Standard 2–3 Business Days • Two Revisions Included

Rush and same-day service are available. For urgent projects requiring delivery within a few hours, please contact us directly.

Ready to Order Your Title 24 Report?

Upload your plans, check out online, and get your permit-ready report in 2–3 business days. Starting at $199.

Contact Us