Home ADU Reports Residential Reports Multifamily Reports Commercial Reports Wholesale for Firms Title 24 Guide Pricing How It Works Services Locations Climate Zones About Contact Order Now →
For Professionals

Title 24 Reports for Architects, Designers and Contractors

Upload the plan set, pay online and receive a permit-ready Title 24 report in 2–3 business days. Two revisions are included for plan-check corrections, and the CF1R is registered in CHEERS where required.

Short answer: Architects, designers and contractors order Title 24 reports from Title24Comply online in under five minutes: choose the report type, enter the project details, upload the plan set as a PDF and pay securely through Stripe. Standard turnaround is 2–3 business days, with 24-hour and same-day rush options. Two revisions are included for plan-check corrections, and the CF1R is registered in CHEERS where the project requires it.

Order for your next project

Upload the plan set, pay online and receive a permit-ready report in 2–3 business days. ADU from $199 · Single-family from $245 · Multifamily from $345 per building. Rush options available.

How Design and Construction Teams Use Title24Comply

The ordering process is the same whether you are the architect, the designer or the general contractor pulling the permit. You send the drawings you already have; we model the project in CEC-approved compliance software, prepare the CF1R (or the LMCC for low-rise multifamily), register it where required, and email a permit-ready PDF that you or your client can submit with the permit application.

ReportStarting priceIncluded before size add-ons
ADUFrom $199Up to 1,000 sq ft, then +$9 per 100 sq ft
Single-family residentialFrom $245Projects under 3,500 sq ft, then +$49 per 500 sq ft
MultifamilyFrom $345 per buildingUp to 4,000 sq ft and 4 units, then +$25 per 500 sq ft; extra units $95 each
Commercial and tenant improvementsCustom quotePriced by scope

The final price follows the square footage and unit count on the plans. If an adjustment is needed, we contact you before proceeding. Full details are in the pricing section of our homepage.

What Sheets to Include in the Plan Set

Upload the full set as a PDF rather than picking individual sheets. The energy model draws on most of it:

For additions and alterations, show existing and new work clearly, because the model treats them differently. The full checklist by project type is on what documents to upload.

Turnaround and Rush Options

OptionTurnaroundAdded cost
Standard2–3 business daysIncluded
24-hour rush24 hours+$49 ADU / +$99 Residential / +$149 Multifamily
Super RushSame day, typically within a few hours+$150, subject to availability

For urgent projects, contact us before ordering so we can confirm same-day capacity. Our pages on rush and same-day service and how long a Title 24 report takes have the details.

Starting From Preliminary Plans

You do not need final, stamped construction documents to order. Preliminary plans are accepted, and modeling early shows which design choices help or hurt compliance while they are still easy to change: glazing on hot elevations, wall and roof assemblies, or the heating system. Most homes and ADUs comply through the performance method, explained in how Title 24 calculations work. The report you submit has to match the permit set, so update it if the design changes before submittal. See preliminary plans for what we need at that stage.

Revisions and Plan-Check Corrections

Every order includes two revisions, and most plan-check corrections fall within them. Send your order ID and the comment letter; we review what the plan checker is asking for, update the model or forms, re-register the report if the change requires it, and send back a revised PDF for resubmittal. If the comments reflect a change in scope, such as added square footage, we tell you about any fee before starting. Read more about plan-check comments and what happens when plans change.

CHEERS Registration and the CF2R/CF3R Hand-Off

Where the project requires registration, we register the CF1R with CHEERS as part of the report. A registered CF1R carries a registration number and date on every page and a CHEERS watermark, and building departments check that these match across the pages; see how to verify a CF1R in CHEERS.

After the permit is issued, the paperwork moves to the field:

  1. The installing contractor completes the CF2R (Certificate of Installation) for the measures they install.
  2. Where the CF1R lists measures for field verification, an independent ECC (HERS) rater tests them and completes the CF3R (Certificate of Verification).
  3. The building inspector checks the registered forms at final inspection.

Send the registered CF1R to your HVAC installer, insulation contractor and rater at the start of construction; its verification summary tells them what will be tested. Title24Comply does not perform HERS field testing. Our guides to CF1R vs CF2R vs CF3R and whether you need a HERS rater explain each step.

Several Projects or Commercial Work

Each project is ordered on its own, so every report has its own order ID for revisions and plan-check follow-up. If several projects are starting at once or you want to coordinate timing across them, contact us before ordering. Commercial projects, including tenant improvements, are quoted individually; see commercial Title 24 for the project types and forms involved. Firms with steady volume can apply for wholesale pricing.

Frequently Asked Questions

Who signs the CF1R?

The energy consultant who prepares the report is the documentation author, and the responsible designer signs. For typical residential work a licensed engineer is not required to prepare energy documentation; some nonresidential projects need a licensed professional's signature.

Can I order for a client's project?

Yes. Enter your client's project address and details when you order, upload the plans, and the permit-ready PDF is delivered by email.

Which code cycle will the report use?

The report is prepared in CEC-approved software for the code cycle that applies to your permit, which depends on when the application is submitted. See 2025 Title 24 changes for what the current cycle changed.

Does Title24Comply work statewide?

Yes. We prepare reports for projects in all 16 California climate zones, entirely online, so the project location does not change how you order.

Questions & Answers

Related Title 24 Topics

Browse the complete Title 24 guide →

Why Choose Title24Comply?

  • CHEERS-Registered Reports
  • Fast 2–3 Day Turnaround
  • Rush Service Available
  • California Energy Specialists
  • Two Revisions Included
  • Permit Submission Ready
  • Affordable Fixed-Rate Pricing Starting at $199
  • 100% Online — Order From Anywhere in CA
HOW IT WORKS

From Order to Delivery

Simple, fast, and permit-ready.

Select your Title 24 report type, fill in project details, and pay online
1 Place Your Order

Select your report type, fill in your project details, upload your plans, and complete payment. The whole process takes under 5 minutes.

• Select Your Report Type • Fill In Project Details • Secure Online Payment
Our team reviews your architectural plans and prepares your Title 24 compliance report
2 We Prepare Your Report

Our team reviews your architectural plans, runs the Title 24 energy calculations, and gets your CF1R or LMCC report ready for submission.

• Plan Review & Analysis • CEC-Approved Software • CHEERS Database Filing
Title 24 report delivered to your email inbox as a permit-ready PDF
3 Delivered to Your Email

Your completed, permit-ready report is emailed to you as a PDF — stamped, CHEERS-registered, and ready to submit to your building department. Revisions are available if needed.

• Permit-Ready PDF by Email • Standard 2–3 Business Days • Two Revisions Included

Rush and same-day service are available. For urgent projects requiring delivery within a few hours, please contact us directly.

Ready to Order Your Title 24 Report?

Upload your plans, check out online, and get your permit-ready report in 2–3 business days. Starting at $199.

Contact Us